We have following set up.

A B
SERVER 1 SERVER 2
Master<------>|-Libreary| Slave
| | | |
|--------->|-Drive1 | |
| Drive2--|<----------|
Library is attached to master server. One drive is on Master &
other drive is on Salve.
We are backingup slave regularly.
Now we want to remove Master server.
We have to change slave server to Master.
We will attach library to server B .
Is it possible to chage Slave server to Master Server ?
What are the config changes needed ?
I appreciate immediate response.
Thanks in advance.

Jipad