Has anyone ever worked out a way to measure how often and how long a job is
queued waiting for an available tape drive? I have not seen any obvious
way to find this in the various logs I have looked at.

I'd like to find if if I have a significant problem of jobs waiting for tape
drives.

Scott
(Unix - NB 6.0)