Hi all,the NBU version is 5.1 mp2,the master server is hpux 11i,the informix
database is IDS 9.4 and also a hpux 11i box.
Now everytime the backup job for informix can backup all dbspaces
complete(from onbar act_log,and erverytime I do a level 0 backup),the until
the last dbspace had been backuped,a new level 0 backup start again.But
after this backup progress complete(from the bar_act, all backup complete
without error),this policy reture status code is 6 and the backup scedule of
informix/etc didn't start.What's wrong?
Thanks!