Hi
I've got two servers (windows 2000 advanced server + backup Exec 9.0) forming
a cluster.
I scheduled a job to backup data in the shared storage unit.
When the job begins, I unlink the active node from the local network in order
to simulate a network failure. Then the cluster switches but the backup job
isn't re-schedule on the second node : it appears on the backup exec management
interface to have been canceled by the user.
Is anyone have an idea?
Thanks.