Backup Strategy Help needed - Veritas Backup Exec

This is a discussion on Backup Strategy Help needed - Veritas Backup Exec ; Preferences:6 Tape Autoloader, BE 8.6, Win2000 Planed: Daily Differencial (Mo-Th), 1. to 4. Fr Full, but also a Monthly Full at the last Fr. Is there a possibility to prevent the crossing between the two jobs that run in a ...

+ Reply to Thread
Results 1 to 3 of 3

Thread: Backup Strategy Help needed

  1. Backup Strategy Help needed


    Preferences:6 Tape Autoloader, BE 8.6, Win2000
    Planed: Daily Differencial (Mo-Th), 1. to 4. Fr Full, but also a Monthly
    Full at the last Fr. Is there a possibility to prevent the crossing between
    the two jobs that run in a month with only 4 weeks (Monthly, last Friday
    which corresponds with 4.th Friday)? Or is there the possibility to cancel
    a job automaticaly if another is running? Thanks a lot for help!!!

  2. Re: Backup Strategy Help needed


    If you partition the slots so that each job goes to a specific slot, and if
    you point the monthly job to the same slot as the friday slot, and if you
    schedule the monthly for 10 minutes earlier than the Friday job, that ought
    to work.

    "Uwe" wrote:
    >
    >Preferences:6 Tape Autoloader, BE 8.6, Win2000
    >Planed: Daily Differencial (Mo-Th), 1. to 4. Fr Full, but also a Monthly
    >Full at the last Fr. Is there a possibility to prevent the crossing between
    >the two jobs that run in a month with only 4 weeks (Monthly, last Friday
    >which corresponds with 4.th Friday)? Or is there the possibility to cancel
    >a job automaticaly if another is running? Thanks a lot for help!!!



  3. Re: Backup Strategy Help needed


    "Uwe" wrote in message news:3c5ffe4d@hronntp01....
    >
    > Preferences:6 Tape Autoloader, BE 8.6, Win2000
    > Planed: Daily Differencial (Mo-Th), 1. to 4. Fr Full, but also a Monthly
    > Full at the last Fr. Is there a possibility to prevent the crossing

    between
    > the two jobs that run in a month with only 4 weeks (Monthly, last Friday
    > which corresponds with 4.th Friday)?


    No. But it is possible if you do monthly full on the first Fri rather than
    the last.

    > Or is there the possibility to cancel
    > a job automaticaly if another is running?


    Hmm, possibly, but it would be complicated.

    > Thanks a lot for help!!!


    Hope this helps.

    Roger



+ Reply to Thread