I have a series of jobs setup using the advanced scheduling option. They
are set to run every 14 days from the effective date but seem to want to run
every day? Did I miss something? Is this a resolvable issue, if so, how?

My second issue is if I want to make sure a particular job will only backup
to a tape with a particular label, how do I do it?

Thanks in advance.

Peter Shore
Net2 Technology Group, Inc.