scheduling - Veritas Backup Exec
This is a discussion on scheduling - Veritas Backup Exec ; Does anyone know if there is a way in veritas BE 7.3 to schedule a more detailed
schedule than what the defaults are. I want to be able to set a schedule
based on holidays etc. If there is a ...
-
scheduling
Does anyone know if there is a way in veritas BE 7.3 to schedule a more detailed
schedule than what the defaults are. I want to be able to set a schedule
based on holidays etc. If there is a holiday, i dont want the backup to run,
if there are 5 saturdays in a month instead of 4 it throws off my monthly
backup etc etc. The problem is that BE doesnt have scheduling options advanced
enough for what i need to do. I have a 5 tape dlt changer and i do 7 day
backups. Any responses as to whether or not i can add better scheduling functionality
to BE 7.3 would be very much appreciated.
Thanks
-
Re: scheduling
The addition of this type of scheduler has been requested since I've been using
BENT (in the mid-V6 days. The response from (then) Seagate was always
"We'll pass it along as a request"
It has always stayed as just that, a request.
Maybe in V8? (but don't hold your breath)
All you can do about holidays, is before the holiday, reschedule the next backup
for after the holiday. I've got 9 BENT servers that average about 6 jobs a night.
so I know what a hassle this is, but it really is the only way
As far as 5 Saturday Months, if you have the job defined to run every Sat
what's the problem?
David Bennett wrote:
> Does anyone know if there is a way in veritas BE 7.3 to schedule a more detailed
> schedule than what the defaults are. I want to be able to set a schedule
> based on holidays etc. If there is a holiday, i dont want the backup to run,
> if there are 5 saturdays in a month instead of 4 it throws off my monthly
> backup etc etc. The problem is that BE doesnt have scheduling options advanced
> enough for what i need to do. I have a 5 tape dlt changer and i do 7 day
> backups. Any responses as to whether or not i can add better scheduling functionality
> to BE 7.3 would be very much appreciated.
>
> Thanks