Schedule job for Mon-Fri each week, can't do it. - Veritas Backup Exec

This is a discussion on Schedule job for Mon-Fri each week, can't do it. - Veritas Backup Exec ; NW65 sp5 and BE 9.1.1156 I'm trying to create a new job that will run Monday thru Friday each week. If I use an existing profile that was working previously, the job gets scheduled for one day each week (repeat ...

+ Reply to Thread
Results 1 to 3 of 3

Thread: Schedule job for Mon-Fri each week, can't do it.

  1. Schedule job for Mon-Fri each week, can't do it.


    NW65 sp5 and BE 9.1.1156
    I'm trying to create a new job that will run Monday thru Friday each week.
    If I use an existing profile that was working previously, the job gets scheduled
    for one day each week (repeat interval is every 1 week). If I had scheduled
    it to start on a Monday, in the schedule view it shows up on every Monday
    and that's it. The only way I can get to a place that lets me edit the days
    of the week schedule is to create a new job and create a new profile while
    doing that. Even then, in schedule view, it only shows up one day per week.


  2. Re: Schedule job for Mon-Fri each week, can't do it.

    Michael Taylor wrote:
    > NW65 sp5 and BE 9.1.1156
    > I'm trying to create a new job that will run Monday thru Friday each week.
    > If I use an existing profile that was working previously, the job gets scheduled
    > for one day each week (repeat interval is every 1 week). If I had scheduled
    > it to start on a Monday, in the schedule view it shows up on every Monday
    > and that's it. The only way I can get to a place that lets me edit the days
    > of the week schedule is to create a new job and create a new profile while
    > doing that. Even then, in schedule view, it only shows up one day per week.
    >


    In your policy make sure that on the "Backup Method" and "Media Usage"
    tabs the days that you want to make a backup are active.

    --
    Marcel de Roode
    Erasmus University Rotterdam

  3. Re: Schedule job for Mon-Fri each week, can't do it.

    Backup Method set to Full for Monday - Friday, Sat. and Sun. inactive. Media
    Usage is Overwrite Media for Monday - Friday, and append for Sat. and Sun.


    >>> On 08/16/2006 at 04:05 AM, in message <44e2f36b@ROSASTDMZ05.>, Marcel

    de
    Roode wrote:
    > Michael Taylor wrote:
    >> NW65 sp5 and BE 9.1.1156
    >> I'm trying to create a new job that will run Monday thru Friday each

    > week.
    >> If I use an existing profile that was working previously, the job gets

    > scheduled
    >> for one day each week (repeat interval is every 1 week). If I had

    > scheduled
    >> it to start on a Monday, in the schedule view it shows up on every

    > Monday
    >> and that's it. The only way I can get to a place that lets me edit the

    > days
    >> of the week schedule is to create a new job and create a new profile

    > while
    >> doing that. Even then, in schedule view, it only shows up one day per

    > week.
    >>

    >
    > In your policy make sure that on the "Backup Method" and "Media Usage"
    > tabs the days that you want to make a backup are active.