NSS wide synchronization failed - Veritas Backup Exec

This is a discussion on NSS wide synchronization failed - Veritas Backup Exec ; We have a Netware 6.5 SP4 server running BackupExec 9.1 build 1158.4 with OFM concerned about the line "NSS wide synchronization failed" in the log file SYS:\SYSTEM\OFM\OFMNW.LOG Some nights the backups appear to be fine, for example this message occured ...

+ Reply to Thread
Results 1 to 2 of 2

Thread: NSS wide synchronization failed

  1. NSS wide synchronization failed


    We have a Netware 6.5 SP4 server
    running BackupExec 9.1 build 1158.4 with OFM

    concerned about the line "NSS wide synchronization failed" in the log file
    SYS:\SYSTEM\OFM\OFMNW.LOG

    Some nights the backups appear to be fine, for example this message occured
    in March on the 4th 14th 17th 23rd 26th and 27th. I attach a section of the
    file OFMNW.LOG.
    Can anyone shed light on this please?

    02006 03 27 05:29:00 System Not Synchronized
    02006 03 27 05:30:44 Agent requested synchronization.
    02006 03 27 05:32:59 Pool 'SYS' has been synchronized.
    02006 03 27 05:32:59 Pool 'DATA' has been synchronized.
    02006 03 27 05:32:59 Pool 'USERS' has been synchronized.
    02006 03 27 05:32:59 Pool 'POSTO' has been synchronized.
    02006 03 27 05:32:59 Pool 'SHARED' has been synchronized.
    12006 03 27 05:32:59 NSS wide synchronization failed
    02006 03 27 05:32:59 Backup Agent Activity Detected
    12006 03 27 05:32:59 System Synchronize Failed
    02006 03 27 06:05:41 Agent requested stop synchronization.
    02006 03 27 06:05:45 Backup Complete

    Thanks

  2. Re: NSS wide synchronization failed

    Configure OFM for debug logging:

    http://support.veritas.com/docs/262007

    Look at the logs after synchronization fails. Maybe you will see
    something there that will tip you off to what's going wrong.

    If not, post relevant log section here.

    -Barry.



+ Reply to Thread