I have a netware 4.11 server with 3 spanned drives totalling 15 gig. I want
to replace them with one 20gig (or higher) drive. Question is do I use the
BE disaster procedure for restoring a 4.11 server to get the data on to the
new drive (and if so, will the data backed up from the 3 drive system go
onto the one drive system) or is there some easier way.

Thanks