Has anyone else with BE 8.5 for Netware & AIT (either -1 or -2) experienced
a problem like this:
The backups have been fine, until the data
on one of the servers hit around 32-33Gb, at which point BE
declares the tape to be full and a continuation tape should be
inserted etc. This occurred originally on an AIT-1 drive (35gb)
with 230m AIT-1 tapes and also now on an AIT-2 drive (50gb) with
230m AIT-2 tapes. The servers are NW5.0 SP6a with NWFS volumes.
One thing I've thought of is that the AIT "built in" tape memory capacity
could be exhausted before the physical tape capacity.

Any ideas would be appriciated!

Thanks

Paul.